logo
  • Français
  • Català
  • Español
  • English
  • Home
  • Introduction
  • The project
  • The result
  • Collaborators
  • Contact
proyecto
  • 0. Introduction of the project
  • 1. The starting point
  • 2. Disassembling
  • 3. Repair and improvement of the chassis
  • 4. Adaptation of the mechanics to the chassis
  • 5. Transformation of the body
  • 6. Mechanical preparation
    • 6.1. Steering
    • 6.2. Front suspension
    • 6.3. Car pedals modification
    • 6.4. Brakes
    • 6.5. Preparations of the clutch
    • 6.6. Gearshift and transmission
    • 6.7. Engine preparation
    • 6.8. Engine assembly
    • 6.9. Engine start-up
  • 7. Body preparation
    • 7.1. Roll cage
    • 7.2. Interior
    • 7.3. Doors and sides
    • 7.4. Front part
    • 7.5. Rear part
    • 7.6. Paint
  • 8. Final assembly
  • 9. Electricity system and accessories
  • 10. Road test
  • 11. Upholstery and final touches
  • 12. Windows and ornamental tops

5. Transformation of the body

Polyester resin and fiberglass become art. The new front and rear, once the rest of the body has been modified and assembled to the chassis, thus becoming a single body, allow us to have a glimpse to the look of our new Alpine.

Legal text · Design and development: materiacreativa.com